beBee background
Professionals
>
Construction / Facilities
>
Indiāl
ASHISH PRABHURAJ

ASHISH PRABHURAJ

APPLICATION FOR THE POST OF PROJECT MANAGER-MEP
Indiāl, Udhampur district

Social


About ASHISH PRABHURAJ:

I am an Ireland work permit holder searching for a job as Project manager - MEP or ,Maintenance Manager. I am having experience in design, site execution and maintenance in data center, mall, hospital, IT Park, university, apartment etc.

Experience

 

THE HAMAD MEDICAL CITY (650 Bedded, JCIA), Largest Govt. Medical City                                                                                                                                    

   (From APRIL 2021 to APRIL 2022), Job Location:  QATAR

Position Title: PROJECT MANAGER – MEP for new Hospital Project + FACILITIES, MAINTENANCE, OPERATIONS for existing hospital, Type: MEP Consultant

 

THE AGA KHAN UNIVERSITY, Largest Pvt. University                                                                                                                                  

   (From NOV 2020 to FEB 2021), Job Location:  KENYA

Position Title: COMMISSIONING MANAGER – MEP, Type: MEP Consultant

 

THE AGA KHAN HOSPITAL (179 Bedded, JCIA) AKDN Data Center                                                                                   

   (From FEB 2017 to OCT 2019), Job Location: TANZANIA

Position Title: PROJECT MANAGER – MEP for new Hospital Project + HEAD OF FACILITIES AND MAINTENANCE for existing hospital, Type: Client

 

YAS MALL, The Largest Mall in Abu Dhabi                                                                                                                                                                             

   (From JUNE 2012 to OCT 2016), Job Location: UAE

 Position Title: PROJECT MANAGER –MEP, Type: MEP Contractor

 

SIDRA HOSPITAL & RESEARCH CENTRE (400 Bedded, JCIA), 7 Star Hospital (From NOV 2008 to JUNE 2012), Job Location:  QATAR

Position Title:  SENIOR PROJECT ENGINEER –MEP, Type: Main Contractor

 

BURJ KHALIFA, The Worlds Tallest Building (179 Storied + Pinnacle)                                               

   (From OCTOBER 2005 to NOVEMBER 2008), Job Location: UAE

Position Title:  SENIOR PROJECT ENGINEER –MEP, Type: Main Contractor

 

INFOSYS TECHNO PARK, The Largest Techno park in India                                                                                                                                                         

(From JUNE 2002 to SEP 2005), Job Location: INDIA

Position Title:  PROJECT ENGINEER –MEP/ MECHANICAL, Type: MEP Consultant

 

 

 

 

                              MY EXPERIENCE IN DESIGN & SITE EXECUTION 

In HVAC System:  Chilled water pipe lines (supply & return) Ducting (supply, fresh air & return), Pumping Station, Heat exchangers, Star and Lift Pressurization duct, 500 ton screw air cooled chillers, 900 ton water cooled dual compressor screw chillers, 2000 ton water cooled dual compressor dual chillers, FAHU, AHU, FCU, Valve package of AHU, FCU, Chillers, ESP, FANS (main & jets, exhaust), Acoustic ducting, Chemical flushing, make up lines, R-134A Filling, R-22 filling, fiber glass insulation, elastomeric insulations, Split AC, Cassette type AC, VRF system, DX system, Toilet exhaust ducting and fan, Laboratory fume hoods and exhaust, Domestic fans, grills, diffusers, VAV, Fire Damper, Fusible link Dampers, Motorized Smoke and Fire Dampers, Laminar flow, Dehumidifiers, Noise barrier for chiller, floating slabs for chiller, AAV, Air balancing for ducts, Chilled water balancing, Kitchen exhaust and ducting, negative & positive pressure monitors, hygrometers, smoke zones, car park jet fans, Heat load calculations, 2 way valve, 4 way valve, VFD drive secondary pumps, primary pumps, CO car park sensors, AGSS piping and pumps, AHU/FCU Drains and calculations, Chilled water pipe sizing, Piping and Ducting Clamping and supports, Cooling towers and its pumps, Glycol chillers, Overhauling of Chillers, Vacuuming of chillers, Pressure testing of chillers, Refrigerate recovery of chillers, Delta-T Analysis, Yearly Descaling of chillers, Chiller Simulation test, Calibration of Transducers, Gauges, Flow meter, Flow Switch, Heat tracer Analysis, Robotic Duct Cleaning, Chilled water leakage detection Analysis, MSFD –Fire Alarm Zoning, Fire Zone Zoning with HVAC, DOP test, Particle Count test, Classification of OR rooms, Hepa Filter selection and replacement, Manual Dampers, Plenum Box, Spring Isolators, Roller handers, Rubber lined clamps, Clevis clamps, Ring clamps, Replacement of chiller fans, ACH calculation, Bio safety Cabinets and its Ducting, Balancing valves, making system concept, load calculations, system zoning, air distribution, Equipment selection, Duct Size calculation, Adjustment testing and Balancing, EER analysis, Calibration of gauges, scenting system, Air cutters, curtain Diffusers, 4 pipe system, CFD analysis for car park jets.

Standards Undergone:  SMACNA, ASHRAE, ANSI, NFPA, ARI, ACCA, HTM-03

 

In WATER SUPPLY:  PPR pipe, CPVC pipes, MLCP pipes, PEX pipes, GI pipes, PVC pipes, UPVC pipes, Copper pipes, medical hard drawn copper pipes, HDPE pipes, PP pipes, Ductile Iron pipes, Stainless Steel pipes, Irrigation piping, Sensor Taps, Sanitary wares, OHT, Water tanks Hot & Cold, Water hammer arrester, Trap primer, Thermostatic mixing valve, Hot water return lines, Chilled Cold water supply, PRV Installation and drain, Water meter, PRV stations, Telescopic expansion joints, Chlorination pumps, PUMP rooms, Balancing valve assembly for Hot water return, Hydro Phunematic Transfer Pumps, Booster Pumps, Sump Pumps, Bore hole Piping, Multimedia Filtration System ,UV Filtration system, Chlorination System ,Legionella Silver Copper Ionization, Thermostatic mixing valves, Relief lines, RO system, Solar Hot water system, Steam traps, Steam piping, VC pipes, Holiday Test, Cast iron piping, Vacuum Breaker, Fire Tank, Water transfer express risers and pumps, BMS integration with Water meters & Flow switches, Water fountains and its filtration system, water pipe insulations (fiber glass and elastomeric),Automatic air vents, Eye showers, Eye wash, NRV, Loop expansion joints, Hot water electrical and SNG Calorifiers, Heat Pumps, Hot water Boilers-smoke tube , 2000 kg.hr, 5000kg.hr, 8000 kg/hr, Steam Boilers-Smoke tube,10,000 kg/hr, Rubber lined clamps, clevis clamps, Heat tracer, PRV drains, CDP drains, Fire drains, Self Cleaning Velocity simulator, Pressure testing, Dialysis line ionization, Legionella testing, Water testing (Biological, Chemical and Physical as per IS10500), Water pipe sizing, Head Loss Calculation, Pump Selection, Insulation selection, Support selection, Pressure discharge pumps and its piping, Calibration of Gauges, AGV cart wash, BMS integration. 

Standards Undergone: IPC 2009, IS, ASTM, ANSI, AWWA, BS, ASHGAL, DEWA, HTM-04 

 

In DRAINAGE / VENT/ STORM WATER: Drainage, Soil and Rain water piping, Sand ware pipes, VC pipes, DI pipes, GRP pipes, HDPE pipes, Cast Iron pipes, Cement lining pipes, UPVC pipes, Manholes, Sump Pits, Elevator Pits, Floor Drains, Roof Drains, Planter Drains, Acid normalization Chamber, Waste Agitators, Vent Piping, Telescopic Expansion Joints, Gully Trap, Fire drains, AHU & FCU Drains, Back flow preventers, Grease/Oil Interceptor, ACO Drains, Peculation pits, Sump pumps, Effluent treatment plant, Dilution traps, MBR treatment plant, Waste sump collectors, Back Drops, Catering waste lines, Manhole and Chamber covers, Sanitary wares, Air admittance Venting system, Storm express risers, Self cleaning velocity achievement, Drainage, soil and storm design calculations, Single stack & Two stack systems, Pipe Sizing, Rain water outlets, Multi traps, Floor drains, Medical Sinks, Pressure cleaning, FIC, Micro tunneling for drainage piping, Velocity Breakers, Hydraulic radiant & bore size calculations, BMS integration.     

Standards Undergone:  IPC 2009, AWWA, ASTM, IS, BS, ANSI, ASHGAL, DEWA, HTM-04

 

In HEAT TRACER: - Done installation and maintenance of heat tracer work for non-hot water return precision lines for Pharmaceuticals.

Standards Undergone: BS EN 623395, HTM-04.

 

In FIRE PROTECTION: Black Steel pipes, GI pipe, Ductile Iron pipes, Deluge valve system, Pre Action System, FHC, FHR, Yard Hydrants, FBI, ZCV Assemblies, PRV Station, ACV, Pump Rooms, Loop Expansion Joints, V-Loop Expansion joints, Quick/Standard/Industrial/Extended Sprinklers, Fire pump room, Co2, DCP, Foam Extinguishers, Fire drain, BMS, LIFT and Fire Alarm integration, Kitchen Foam Suppression system, 1000 Gpm Electrical main Pumps, 15 Gpm Jockey pumps, 1000 Gpm Diesel Sub Pumps, Relief lines, Test lines, Pump Panels, upright-pendent-sidewall sprinklers, Fire Sealant works, Fire Zoning, Fire Pipe Sizing, Fire Pump Head Calculation, Fire rated walls and Doors, Sprinkler riser, Header Riser, 60000 Gallon Tank, Breeching Inlets, Fire Supporting systems, Seismic Supports, 24 x 7 integration. 

Standards Undergone: NFPA 13,14, 20, 25, 17,16, 5000, 2001, 2010, 12, 11, 101, 10, ASTM, ANSI, BS, AWWA, DCD, QCD, HTM-05.

 

In FM 200: FM 200 black steel piping’s, FM 200 Cylinder installations, nozzle installation, Designing and commissioning, Room integrity test, Gas Density Calculation, Integration with BMS and Fire Alarm. 

Standards Undergone: NFPA 2001, ANSI, ASTM, HTM-05.

 

In AEROSOL SYSTEM:  Aerosol generator Installation, Design and Commissioning, Room integrity test, Gas Density Calculation, Integration with BMS and Fire Alarm. 

Standards Undergone: NFPA 2010, ANSI, ASTM, HTM-05.

 

In SWIMMING POOL:  Installation and maintenance of swimming pool work using skimmers, Heat exchangers, chlorination plant/PH controller, overflow edge system, UV lights, Multi Media Filtration system.

Standards Undergone: BS EN 15288, IPC 2009, ASTM, ANSI.

 

  In MEDICAL GAS: Medical gas piping using Copper pipe ASTM B88, Nitrous Oxide piping, Oxygen Piping, Carbon Dioxide                 piping, Entonox piping, Anesthesia gas piping, Vacuum piping, Liquid Oxygen tank, Manifold rooms, Nitrogen Tank, Vaporizer, Dispenser points, Vacuum Machine portable and plant, Medical air plant, ASV, Medical gas alarm system, BMS integration, Flushing, Welding.   

Standards Undergone: BS EN 737 / HTM 2022, ASTM B 88, ANSI, ASTM, HTM-02.

 

In LPG:  Carbon Steel piping, Vaporizer, LPG tank, PRV, integration with deluge valve system and BMS, Gas detector, Pipe in Pipe clear containment, Gas panel, sounder, Emergency Push shut valve, seismic support, Cathodic protection, Gas meters, Solenoid shut off valves.

Standards Undergone: BS 1387, BS21, NFPA 58, ASTM, ANSI, HTM-05.

 

In NATURAL GAS: Carbon Steel piping, Vaporizer, LPG tank, Pressure Reducing Station, integration with deluge valve system and BMS, Gas detector, Pipe in Pipe clear containment, Gas panel, sounder, Emergency Push shut valve, seismic support, Gas meters, Solenoid shut off valves, Gas riser dampers, Gas Relief Valve. 

Standards Undergone: BS EN 1057, NFPA 54,ASTM, ANSI, HTM-05.

 

In STEAM PIPING / BOILER: Carbon Steel steam piping, Smoke Tube Boiler, steam trap and piping, buffer vessel installation/Clarifier installation, Degasser unit, Heat exchangers, Boiler panels, Boiler Circulation pumps, BMS integration, Boiler Condensate Drain.

Standards Undergone: BS EN 12952, ASTM, ANSI, HTM-04, OSHA.

 

In LAUNDRY:  Tunnel Washer, Dry cleaning machine, Weighing machine, Sorting batch, Ironing equipment’s, Folders, Steam pressers, lint collector, piping installations, Sling bags, Monorails, Vacuum packing, Integration with BMS, Portable steam machine, Laundry oil & Grease interceptor.

Standards Undergone: ISO 10472, ASTM, ANSI

 

In WASTE MANAGEMENT / INCINERATOR: Waste management equipment’s piping installation and trenches, Waste Shedders, Diesel Incinerator, chimney installation, wet scrubber installation, biodegradable freezers, AGV integration, BMS integration, Weighing bridge. 

Standards Undergone: BS 3316, ANSI, HTM-07, HTM-01, HTM-03, FMS-8.

 

In AGV:  Installation and maintenance of trenches and piping for AGVCart wash

Standards Undergone: ANSI B56.5, ASTM, ANSI, HTM-04.

 

In PTS: Stainless steel piping for phunematic tube system from medical pharmacy to hospital building, feeder, diverters, interface room and blowers.

Standards Undergone:  HTM 2009, ASTM

 

In COMPRESSED AIR: Compressed air stainless steel piping for laundry, sling bag conveyor system and for laundry pressing and ironing system, Screw oil compressor. 

Standards Undergone:  HTM 2009, ASTM

 

In FIRE ALARM / GAS DETECTION / ELV / LV, ELECTRICAL (POWER / LIGHTING) / ELECTRICAL MV SIDE: Gas Meter Box, Gas Panel, Gas Detector, Conduting, Cable tray, Trunking, DB, SMDB, MDB, RMU, Bus Bar, LV Panel, 2000 KVA Transformer 11KV/420 V, CAT-6a Cables, FP-200 Cables, XLPE/AWA Cables, HV Panel 11KV, Megger Test, Continuity Test, Isolators, DP Switches, LUX Calculation, Access Control, Fire Alarm Panel, Fire Alarm Repeaters Panel, Smoke Detectors, Multi Detectors, CO2 Detectors, Interface Modules, UPS, Automatic dimming system, LED Lightings, MCCB, Earthling/Lighting protection, MV PanelSwitch gear Room, smoke detectors, MCP, Sounder, Strobe Light, Electrical load Analysis, Cable tray Installations, LV Panels, PF correction installation, ATS panels, Socket, Pole transformers, Cable trenches. 

Standards Undergone:  NFPA 70, 72, IEE, IEC, BS7671, ISO.

 

In SAUNA / STEAM: Installation and Maintenance of sauna heater / Steam generator

Standards Undergone: BSEN 15821:2010

 

In NURSE CALL BELL SYSTEM: Installation and maintenance of Nurse call bell, CAT-6A Cabling, conduting, Nurse bell monitors, bell lights, bed cords, nurse call control panel. 

Standards Undergone:  HTM 08-03

 

In BMS: Coordination and Maintenance of BMS system with mechanical and electrical system, BacNet, ModBus, DDC, MEP connections, CAT-6A Cabling, architecture, AI, DI, AO, DO. 

Standards Undergone:  BS EN 15232

 

In DIESEL GENERATOR: Installation coordination and maintenance, Synchronization for 1500 kva, 750 kva, 320 kva for Diesel Generator, ATS Panel, Woodward generator panel, Diesel lines, Acoustics, Air intake Louvers, Exhaust Ducting, Exhaust Piping, Mufflers, Coordination for Generator Over Hauling, Load testing, Fuel Filter Changing, Oil Filter Changing, Air Intake filter changing, Coolant Refilling, Start up alternator Changing, Start up 24 V Battery Installation, Lead acid battery maintenance, Turbo charger maintenance, Daily generator no load warm up, Monthly generator load test, Coordination for generator simulation test.

Standards Undergone:  BS EN 60034, IEE.

 

In SOLAR WATER HEATER:  Installation and maintenance of solar collectors, clarifier integration, boiler backups, light sensor integration, solar glycol circulation pumps. 

Standards Undergone:  ISO 9459

 

In PUBLIC ADRESS SYSTEM:  Installation and maintenance of public address system.

Standards Undergone:  BS 6259

 

In COLD ROOMS (Medical and Non-Medical): Installation and maintenance of cold room, BMS connections for humidity and temperature monitoring.

Standards Undergone:  BS 2502

 

In LAB Fume hoods / Bio Safety Cabinets / MRI room / Cath LAB / Autoclaves / Plasma machines:  Done the installation and maintenance as per HTM standards.

 

In LIFTS: Installation Coordination, Maintenance co-ordination for Traction control machines, group control panel installation, Lift screen customization, ARD Panel, Bed lifts, passenger lifts, counter weights, BMS integration, Lift emergency communication system, Fire panel integration, Access card integration.

Standards Undergone: BS EN-81, IEE

 

In RO Plant / Multimedia filtration / Sewage Treatment Plant (MBR): Installation and maintenance.

Standards Undergone: AWWA B130 2018

 

In Data Center: 

  • Installation of Room type, air cooled type *:  25 KW Air cooled cooling load capacity, cold aisle containment-down flow, under floor plenum, 7 feet Server Racks, SSD type Data centre, DX system with humidifier, FM 200 system (Below trench, room and ceiling), MSFD integration with DX system, Fire alarm integration with MFAP, + 50 Pascal Room integration test, Hilti sealants, blinding, supply air floor perforated grill, return air grill, CFD analysis, BMS connection for temp & humidity sensors, Access door-FA connections, Double conversion UPS system, basic PDU system, modern system power chain.

 

Standards undergone: EN 50600, ISO 14000, ISO 9000, ANSI/TIA-942, ASHRAE TC 9.9, 6.4.

 

In COMMISSIONING: Standards undertaken (few mentioning), NEBBN Standards, NFPA3, 25, ASHRAE 202,0,90.1,1.1,1.4SMACNA014, OSHA, ANSI / NSF 49, BSEN81, latest BMS architectures, NFPA58, ANSI / NETA ECS-2020, NFPA70, 72,3,4,BS 5839-1, IPC, ASHRAE188, ASME 814,NFPA-54, HTM-04, 01,03,05,06,07,08,02,2010,2000, ACOP L8, IS 10500, IS0 14664 etc.

 

FEW MAJOR EQUIPMENT INSTALLED & COMMISSIONED (mentioning only 3 projects as example):         (PROJECT-1) Undertaken 300 AHU, 250 FCU, Secondary pumps and primary pumps 2 each, 1500 KVA generator-2 nos, 1000 kva generator-1nos, Fire pumps: 1 diesel, 1 electrical,1000 gpm each, 1 Jockey 15 gpm,  smoke tube, hot water boilers, 500 kg/hr: 1 nos, vacuum pumps-1 nos, medical gas plant- entonox, nitrous oxide, oxygen, carbon dioxide, diesel incinerator,wet scrubber type – 1 tons/day, medical air plant – 1 screw compressors, , negative pressure rooms 15 Pascal:- 2 nos, LAB, water tanks, 100000 lts:-2 nos, fire tank:- 60,000 gallons x 2 nos, DX system – 2 nos, 15 ton each, VRF system, 2 ton each – 5 nos, Air cooled screw chiller- 2 nos, 500 ton, transformers, 2000 kva :- 2 nos, 11kv MV panel:- 1 nos, water consumption 12,000 liters/days, RO plant, 10000 liters/day, MBR STP, 10000 liters/day, TMV – 10 nos, ICT rooms -6 nos, BMS ,bacnets:- 10, Modbus:- 17. Co2 supression system – 7 nos, FM200- 2 nos, LPG, tank 5000 lts - 12 points.

(PROJECT-2&3) Undertaken 2000 ton water cooled Maquay screw compressor chillier’s (dual compressor) x 13 Nos (big plant), 500 AHU, 760 FCU, Secondary pumps and primary pumps 13 each, 6.6kv starter panel-13 nos, 2000 KVA generator-6 nos, 1000 kva generator-14 nos, cooling towers-13 nos, Fire pumps: 2 diesel, 2 electrical , 2 jockey, 1000 gpm each, smoke tube, steam boilers,1000 kg/hr: 4 nos, vacuum pumps-4 nos, medical gas plant- entonox, nitrous oxide, oxygen, carbon dioxide, liquid oxygen tank- 10000 lts, AGSV- 4 nos, diesel incinerator, wet scrubber type – 3 tons/day, medical air plant – 4 screw compressors, PTS: 20 satellite points, Nurse call bell system: 170 nos, Bed pan washers:- 30 nos, OR Panels: 4 nos, fresh air canopy:- 2 nos, negative pressure rooms, 15 Pascal:- 8 nos, water tanks, 100000 lts:-2 nos, fire tank:- 60,000 gallons x 2 nos, kone automatic sliding doors, 10 nos, DX sytem – 2 nos, 15 ton each, VRF system, 10 ton each – 5 nos, Air cooled screw chiller- 2 nos, 500 ton, transformers, 2000 kva :- 6 nos, 11kv MV panel:- 3 nos, water consumption 12,000 liters/days, RO plant, 10000 liters/day, MBR STP, 10000 liters/day.TMV – 650 nos, Plate heat exchangers:- 10 nos, ICT rooms -12 nos, BMS ,bacnets:- 30, Modbus:- 237, 200 AHU, 210 FCU, Secondary pumps and primary pumps 2 each, , 1500 KVA generator-2 nos, 750 kva generator-1 nos, ,Fire pumps: 2 diesel, 2 electrical , 2 jockey, 1000 gpm each, smoke tube, steam boilers,700 kg/hr: 4 nos, vacuum pumps-4 nos, medical gas plant- entonox, nitrous oxide, oxygen, carbon dioxide (1 each), liquid oxygen tank- 10000 lts, AGSV- 2 nos, diesel incinerator, wet scrubber type – 2.4 tons/day, medical air plant – 4 screw compressors, PTS: 20 satellite points, Nurse call bell system: 170 nos, Bed pan washers:- 20 nos, OR Panels: 4 nos, fresh air canopy:- 2 nos, negative pressure rooms, 15 Pascal:- 8 nos, water tanks, 110000 lts:-2 nos, fire tank:- 60,000 gallons x 2 nos, kone automatic sliding doors, 10 nos, DX system – 2 nos, 15 ton each, VRF system, 10 ton each – 2 nos, Air cooled screw chiller- 2 nos, 500 ton, transformers, 2000 kva :- 6 nos, 11kv MV panel:- 3 nos, water consumption 12,000 liters/days, RO plant, 10000 liters/day, MBR STP, 10000 liters/day. TMV – 650 nos, Plate heat exchangers:- 10 nos, ICT rooms -12 nos, BMS, bacnets:- 30, Modbus:- 237, FM200-6 nos, DDC- 80 nos, Smoke detectors – 700 nos, Main fire alarm panel – 10 nos, LPG tank , 3000 lts- 1nos…..etc…….

 

                               MY EXPERIENCE IN FACILITIES AND MAINTENANCE

Education

BE. Mechanical Engineering (4ys) + Diploma in CADD + Certification in MEP Design + Certified Senior Member- Indian Society of Mechanical Engineers + Project Management Professional Course Certification of 35 PDU + Certification in Project Management + Certification in Facilities - Maintenance & Repair  + Certification in Data Center Infrastructure Design & Management + Certification in Business Analysis & Process Management + Engineering License from Tanzania Registration Board + Member - International association of Engineers

Professionals in the same Construction / Facilities sector as ASHISH PRABHURAJ

Professionals from different sectors near Indiāl, Udhampur district

Other users who are called ASHISH

Jobs near Indiāl, Udhampur district

  • Yogini Tradex Private Limited

    time manager

    Found in: Talent IN C2 - 14 hours ago


    Yogini Tradex Private Limited Jammu, India

    All Candidates musthave FACTORYEXPERIENCE · Job Title: TimeManager (ManufacturingFactory) · Location: KATHUAJAMMU · JobDescription: · We are seekingan experienced Time Manager to join our manufacturing factory team.The ideal candidate will have a minimum of 5 years of experience ...

  • iimjobs

    Commercial Finance Head

    Found in: beBee S2 IN - 14 hours ago


    iimjobs Jammu, India Full time

    Location: Jammu Factory · Qualification: Only Chartered Accountants with Strong SAP Experience (both are mandatory) · Industry: FMCG - Manufacturing · Accountability for the financial and commercial management of the · given geographical region. Ensure execution of overall storag ...

  • Larsen & Toubro

    TBM Portal Superintendent

    Found in: Talent IN C2 - 14 hours ago


    Larsen & Toubro Jammu, India

    Mechanical Foreman · Minimum 10 years of experience as TBM Mech Superintendent with minimum 05 years of · experience in Operating Non-EPB, Shielded Rock TBMs. Must have experience · of executing Rock TBM Tunnelling of minimum 4.5km length through single Tunnel · having minim ...