I Have 17+ Years experience in Steel Fabrication & Erection ( Steel Structural, Piping, Tanks, Pressure vessel, Oil & Gas Rig Structures, etc. ) as Fabrication Manager Construction Manger in GCC.
Experience
Nasser S. Alhajri Corporation, Saudi Arabia Dec’2019 to Jan’2022
Construction Manager (Piping)
Project : AMMONIA III Ras Al Khair, Saudi Arabia
Client : MAADEN
- Job Profile:
- Reviewing Method of statement, specifications, and standards of materials (pipes, fittings, flanges, gaskets… etc).
- Studying my scope of piping lines from the layout, P & ID, and isometric drawings.
- Follow up the status of spools and field run pipes through reports from fabrication workshop and painting yard and coordinating for transportation these materials to site.
- Monitoring the Superintendent wise fit up and welding of spool to spool or spool to field run pipe together and welding supports also (as much as possible according to accessibility) to lift and place one time (saving time and effort).
- Coordinating with QC department to cover any required NDT or Heat treatment (preferably before lifting to avoid difficult accessibility).
- Coordination with scaffolding groups to make access for assembly the hole lines at any elevation (fit up and welding by taking level and alignment into consideration).
- Supervising welding vents and drains if any.
- Supervising welding pipe supports which to be erected in position at any structure.
- Coordination with engineering department to divide my piping scope into test packages.
- Close punch items (A items) (release test packages for hydro, service, and visual test.)
- Reinstatement for piping test packages after applying tests and closing punch lists (B & C items) with the main contractor and client.
- Attend the client meeting to discuss about the packages & priorities.
TUSKER ENGINEERING FZC,Sharjah UAE Oct’2012 to Feb’2018 Production Manager ( Fabrication )
Project : Various Structures of DERRICK
Client : MH wirth FZE
Project :Pipe rack structures with piping ( RRE , Abudhabi Takreer site )
Client : SK Engineering
Job Profile:
- Entrusted with the responsibility to plan day-to-day production activities.
- Preparation of Technical & material submittals and documentation works.
- Involved in materials procurement and delivery.
- Analysis of all technical and practical difficulties.
- Accountable for managing dispersed resources, while ensuring optimal utilization of the resources.
- Execute the planning for production & achieving the production targets.
- Co-coordinating with the third-party Inspectors , Quality department & NDE inspectors etc…
- Conciliated the subcontractor bills at the month end.
- Looking inspection activities during blasting & painting.
- Coordinating with client’s Inspector during client inspection at factory
- Co-coordinating with the logistics department & site engineers
- Co-coordinating with the accounts department during the Inventory.
- Doing vendor development to achieve the targets.
- Checked the line as per QCP and ITP during walk down with client and preparing documents as per project requirement. Conducted the welder qualification test according to the approved WPS by client.
- Preparing the WPS , PQR & WPQ as per the project requirement.
- Gained code knowledge of ASME II, VIII, IX, AWSD1.1 etc
AL WADI CONTRACTING & STEEL WORKS W.L.L , Qatar Apr’2008 – March 2012
Production Engineer
Project: Al-Nasr show room -- 750 tons (B+G+2floor steel structure building)
5-School around Doha – 800 tons steel structures
More than 20 hot rolled steel structures building like warehouses, School building roofs, Industrial building etc
Job Profile:
- Entrusted with the responsibility to plan day-to-day production activities.
- Preparation of Technical & material submittals and documentation works.
- Involved in materials procurement and delivery.
- Analysis of all technical and practical difficulties.
- Accountable for managing dispersed resources, while ensuring optimal utilization of the resources.
- Execute the planning for production & achieving the production targets.
- Co-coordinating with the third-party Inspectors , Quality department & NDE inspectors etc…
- Conciliated the subcontractor bills at the month end.
- Looking inspection activities during blasting & painting.
- Coordinating with client’s Inspector during client inspection at factory
- Co-coordinating with the logistics department & site engineers
- Co-coordinating with the accounts department during the Inventory.
- Doing vendor development to achieve the targets.
- Checked the line as per QCP and ITP during walk down with client and preparing documents as per project requirement. Conducted the welder qualification test according to the approved WPS by client.
- Preparing the WPS , PQR & WPQ as per the project requirement.
- Gained code knowledge of ASME II, VIII, IX, AWSD1.1 etc
EXCEL INDUSTRY LLC, AJMAN, UAE Oct 2005- Feb 2008
Project Engineer
PROJECTS
- Hamriya Power House, Phase II for Al kauther contracting Co –800 tons Heavy steel structures
- Dubal power CCPP22 – 1200 tons Heavy steel structures & Piping
Job Profile:
STEEL STRUCTURAL STAGE
- Reviewing Steel Erection drawings.
- Checking civil foundations elevation before steel (columns / frames Erection).
- Supervising ground assembly for main columns with beams to compose frames can be lifted and erected one time.
- Supervising erection of main steel girders and bracings between frames (with consideration of erection sequence).
- Supervising alignment and bolt tightening for main members of the structure on the main Aligns and Axis before offering for inspection.
- Supervising erection of Dressing (erection of small beams, bracings, angles, C-Channels and other medium & light steel items).
- Supervising balance bolt tightening and offering for final inspection.
- Supervising Erection steel handrails and gratings.
- Through all previous steel erection steps, solution for many technical problems in erection due to material defects or wrong design to be set by my or client proposals through RFIs (Request for Information).
- Daily Progress Report will be sent to Superior by daily basis.
- Making invoice monthly wise based on erection report.
PIPING STAGE
- Reviewing Method of statement, specifications, and standards of materials (pipes, fittings, flanges, gaskets… etc).
- Studying my scope of piping lines from the layout, P & ID, and isometric drawings.
- Follow up the status of spools and field run pipes through reports from fabrication workshop and painting yard and coordinating for transportation these materials to site.
- Supervising fit up and welding of spool to spool or spool to field run pipe together and welding supports also (as much as possible according to accessibility) to lift and place one time (saving time and effort).
- Coordinating with QC department to cover any required NDT or Heat treatment (preferably before lifting to avoid difficult accessibility).
- Coordination with scaffolding groups to make access for assembly the hole lines at any elevation (fit up and welding by taking level and alignment into consideration).
- Supervising welding vents and drains if any.
- Supervising welding pipe supports which to be erected in position at any structure.
- Coordination with engineering department to divide my piping scope into test packages.
- Close punch items (A items) (release test packages for hydro, service, and visual test.)
- Reinstatement for piping test packages after applying tests and closing punch lists (B & C items) with the main contractor and client.
SHARP TANKS & STRUCTURALS (P) LTD, Mumbai , India June 2003- July 2005
Junior Engineer
Project :Commissioning of Floating Deck for Reliance Industries Limited at Hazira – 6 nos
Job Profile:
- Preparing BOQ & planning for cutting schedule, inspection like dimension, orientation& Elevation
- Inspection of shell fit up & dimensions.
- Getting the work permit for Hot & Cold works inside the tank
- Coordinating with NDE department.
- Preparing weekly progress report.
- Conducting tests like pneumatic test, Hydraulic test & vacuum test. Nasser S. Alhajri Corporation, Saudi Arabia Dec’2019 to Jan’2022
Construction Manager (Piping)
Project : AMMONIA III Ras Al Khair, Saudi Arabia
Client : MAADEN
- Job Profile:
- Reviewing Method of statement, specifications, and standards of materials (pipes, fittings, flanges, gaskets… etc).
- Studying my scope of piping lines from the layout, P & ID, and isometric drawings.
- Follow up the status of spools and field run pipes through reports from fabrication workshop and painting yard and coordinating for transportation these materials to site.
- Monitoring the Superintendent wise fit up and welding of spool to spool or spool to field run pipe together and welding supports also (as much as possible according to accessibility) to lift and place one time (saving time and effort).
- Coordinating with QC department to cover any required NDT or Heat treatment (preferably before lifting to avoid difficult accessibility).
- Coordination with scaffolding groups to make access for assembly the hole lines at any elevation (fit up and welding by taking level and alignment into consideration).
- Supervising welding vents and drains if any.
- Supervising welding pipe supports which to be erected in position at any structure.
- Coordination with engineering department to divide my piping scope into test packages.
- Close punch items (A items) (release test packages for hydro, service, and visual test.)
- Reinstatement for piping test packages after applying tests and closing punch lists (B & C items) with the main contractor and client.
- Attend the client meeting to discuss about the packages & priorities.
TUSKER ENGINEERING FZC,Sharjah UAE Oct’2012 to Feb’2018 Production Manager ( Fabrication )
Project : Various Structures of DERRICK
Client : MH wirth FZE
Project :Pipe rack structures with piping ( RRE , Abudhabi Takreer site )
Client : SK Engineering
Job Profile:
- Entrusted with the responsibility to plan day-to-day production activities.
- Preparation of Technical & material submittals and documentation works.
- Involved in materials procurement and delivery.
- Analysis of all technical and practical difficulties.
- Accountable for managing dispersed resources, while ensuring optimal utilization of the resources.
- Execute the planning for production & achieving the production targets.
- Co-coordinating with the third-party Inspectors , Quality department & NDE inspectors etc…
- Conciliated the subcontractor bills at the month end.
- Looking inspection activities during blasting & painting.
- Coordinating with client’s Inspector during client inspection at factory
- Co-coordinating with the logistics department & site engineers
- Co-coordinating with the accounts department during the Inventory.
- Doing vendor development to achieve the targets.
- Checked the line as per QCP and ITP during walk down with client and preparing documents as per project requirement. Conducted the welder qualification test according to the approved WPS by client.
- Preparing the WPS , PQR & WPQ as per the project requirement.
- Gained code knowledge of ASME II, VIII, IX, AWSD1.1 etc
AL WADI CONTRACTING & STEEL WORKS W.L.L , Qatar Apr’2008 – March 2012
Production Engineer
Project: Al-Nasr show room -- 750 tons (B+G+2floor steel structure building)
5-School around Doha – 800 tons steel structures
More than 20 hot rolled steel structures building like warehouses, School building roofs, Industrial building etc
Job Profile:
- Entrusted with the responsibility to plan day-to-day production activities.
- Preparation of Technical & material submittals and documentation works.
- Involved in materials procurement and delivery.
- Analysis of all technical and practical difficulties.
- Accountable for managing dispersed resources, while ensuring optimal utilization of the resources.
- Execute the planning for production & achieving the production targets.
- Co-coordinating with the third-party Inspectors , Quality department & NDE inspectors etc…
- Conciliated the subcontractor bills at the month end.
- Looking inspection activities during blasting & painting.
- Coordinating with client’s Inspector during client inspection at factory
- Co-coordinating with the logistics department & site engineers
- Co-coordinating with the accounts department during the Inventory.
- Doing vendor development to achieve the targets.
- Checked the line as per QCP and ITP during walk down with client and preparing documents as per project requirement. Conducted the welder qualification test according to the approved WPS by client.
- Preparing the WPS , PQR & WPQ as per the project requirement.
- Gained code knowledge of ASME II, VIII, IX, AWSD1.1 etc
EXCEL INDUSTRY LLC, AJMAN, UAE Oct 2005- Feb 2008
Project Engineer
PROJECTS
- Hamriya Power House, Phase II for Al kauther contracting Co –800 tons Heavy steel structures
- Dubal power CCPP22 – 1200 tons Heavy steel structures & Piping
Job Profile:
STEEL STRUCTURAL STAGE
- Reviewing Steel Erection drawings.
- Checking civil foundations elevation before steel (columns / frames Erection).
- Supervising ground assembly for main columns with beams to compose frames can be lifted and erected one time.
- Supervising erection of main steel girders and bracings between frames (with consideration of erection sequence).
- Supervising alignment and bolt tightening for main members of the structure on the main Aligns and Axis before offering for inspection.
- Supervising erection of Dressing (erection of small beams, bracings, angles, C-Channels and other medium & light steel items).
- Supervising balance bolt tightening and offering for final inspection.
- Supervising Erection steel handrails and gratings.
- Through all previous steel erection steps, solution for many technical problems in erection due to material defects or wrong design to be set by my or client proposals through RFIs (Request for Information).
- Daily Progress Report will be sent to Superior by daily basis.
- Making invoice monthly wise based on erection report.
PIPING STAGE
- Reviewing Method of statement, specifications, and standards of materials (pipes, fittings, flanges, gaskets… etc).
- Studying my scope of piping lines from the layout, P & ID, and isometric drawings.
- Follow up the status of spools and field run pipes through reports from fabrication workshop and painting yard and coordinating for transportation these materials to site.
- Supervising fit up and welding of spool to spool or spool to field run pipe together and welding supports also (as much as possible according to accessibility) to lift and place one time (saving time and effort).
- Coordinating with QC department to cover any required NDT or Heat treatment (preferably before lifting to avoid difficult accessibility).
- Coordination with scaffolding groups to make access for assembly the hole lines at any elevation (fit up and welding by taking level and alignment into consideration).
- Supervising welding vents and drains if any.
- Supervising welding pipe supports which to be erected in position at any structure.
- Coordination with engineering department to divide my piping scope into test packages.
- Close punch items (A items) (release test packages for hydro, service, and visual test.)
- Reinstatement for piping test packages after applying tests and closing punch lists (B & C items) with the main contractor and client.
SHARP TANKS & STRUCTURALS (P) LTD, Mumbai , India June 2003- July 2005
Junior Engineer
Project :Commissioning of Floating Deck for Reliance Industries Limited at Hazira – 6 nos
Job Profile:
- Preparing BOQ & planning for cutting schedule, inspection like dimension, orientation& Elevation
- Inspection of shell fit up & dimensions.
- Getting the work permit for Hot & Cold works inside the tank
- Coordinating with NDE department.
- Preparing weekly progress report.
- Conducting tests like pneumatic test, Hydraulic test & vacuum test.
Education
BE Mechanical Engineering
Professionals in the same Manufacturing / Mechanical sector as Gopinath Narayanan
Professionals from different sectors near Aruppukkottai, Virudhunagar
Other users who are called Gopinath
Jobs near Aruppukkottai, Virudhunagar
-
Application Developer
Found in: Talent IN C2 - 9 hours ago
BiznezBee India Pvt Ltd Madurai, India Full timeWe are looking for a qualified Application Developer to design and code functional programs and applications. You will work as part of a team and individually with little supervision. · A great Application Developer has excellent knowledge of at least one programming language. Th ...
-
Accountant - Tally
Found in: Talent IN C2 - 9 hours ago
Kukulkan Manpower Consultancy Madurai, India Full timeJob Overview · Accountant role in Pharmacy store at Madurai, Tamil Nadu, India. Full-Time position with a salary range based on experience. · Qualifications and Skills · Proficiency in Tally software and accounting principles · Strong understanding of journal entries, ledgers, a ...
-
Physics Teacher
Found in: Talent IN C2 - 9 hours ago
Kukulkan Manpower Consultancy Madurai, India Full timeWe are searching for an innovative, energetic physics teacher to join our excellent department. The physics teachers responsibilities include preparing stimulating lessons, identifying and analyzing student needs, strengths, and weaknesses, overseeing experiments, as well as sett ...