
SUFIYAN Shaikh
Engineering / Architecture
Services offered
Mechanical & Structural Draughtsman
Experience
Presently working with
GAMMON INDIA LTD.
Gammon House, Veer Savarkar Marg,
Prabhadevi, Mumbai-400025, India
Feb. 2018 to Till Date
Position: Auto Cad Mechanical & Structural Draughtsman.
Projects Worked on:
- Varanasi Ring Road Bridge Over Ganga River, INDIA
- Pawana Bridge, Pune Maharashtra, INDIA
- Signature Bridge, Delhi, INDIA
- Tuticorin Thermal Power Plant, Tamil Nadu, INDIA
- Pokaran Water Supply Project.
- IWPP Sohar Water Transmission, Oman
- Derna and Baida Grain Silo, Libya
Projects Scope Involve:
Auto CAD Draftsman (Mechanical & Piping) position is fully responsible for
Auto CAD Drafting Fabrication & Structural Drawings, Section Drawings
& As Built drawings.
Key Areas of Responsibilities:
- Prepare Segment Lifter Structural Drawings.
- Prepare Noise Barrier Structural Drawings.
- Prepare Silo Structural Drawing.
- Prepare Concrete Bucket Structural Drawing.
- Prepare Any Other Unique design.
- Prepare Tower Crane GAD Drawing.
- Prepare Goliath Crane GAD Drawing.
- Prepare GAD of Crasher Plant.
- Prepare GAD of Transit Mixer Plant.
Mohammad. Ali Ammu & Partner Co. Ltd.
Old Abqiq road, Near Aramco Gate #2, Dhahran
Kingdom of Saudi Arabia
Nov. 2015 to Nov.2017
Position: Auto Cad Mechanical & Structural Draughtsman.
Projects Worked on:
- Arabian Drilling Company, Kingdom of Saudi Arabia
- Kuwait Drilling Company, Kuwait
- Nabors Arabia Company Ltd, KSA
- Weatherford Drilling International, UAE
- Drilling Petroliam Services, KSA
- Dalma Drilling Company, KSA
- Prepare detailed design drawings and specifications for mechanical equipment, using Computer-aided design (CAD)
Projects Scope Involve:
Auto CAD Draftsman (Piping & Structural) position is fully responsible for
Auto CAD Drafting Rigs Tank Piping & Structural Drawings, Section Drawings & As Built drawings.
Key Areas of Responsibilities:
- Prepare Gas & Oil Separator Structural Drawing
- Prepare Pressure Vessel Structural Drawing
- Prepare Rigs Tank Piping Design, Like Suction Tank, Reserve Mud Tank, Shaker Tank,
- Intermediate Tank, Gas & Oil Separator, Diesel Tank, Gasoline Tank, Water Tank
- Prepare All Types Tank Structural Drawing.
- Prepare Drilling Rigs requirements Drawing.
- Prepare Skid Drawing.
- Prepare Transport Equipment for Chemical Structural Drawing.
- Prepare Water, Fuel and Vacuum Tankers Structural Drawing.
- Prepare Acid Transport Tankers Trailers Structural Drawing .
- Prepare Any Other Unique design.
- Prepare all Fabrication Drawing .
- Prepare MTO.
- Prepare Line list, Valve list.
- Maintaining of all drawing & records for issuing of drawing copy.
- Follow standard abbreviation & Legend..
JVS Comatsco Industries Pvt. Ltd.
Gate No. 107/2,Villege-Moha-Nashik
NOV. 2012 to Oct.2015
Position: Auto Cad Mechanical & Structural Draughtsman.
Projects Worked on:
- Sahyadri Industries Ltd. Pune
- JVS Comatsco Industries Pvt. Ltd. Balasinor, Gujrat
- JVS Comatsco Industries Pvt.Ltd. Moha, Nashik
- Prepare Plant Design.
Projects Scope Involve:
Auto CAD Draftsman (Mechanical & Piping) position is fully responsible for
Auto CAD Drafting Plant Drawings , Section Drawings & As Built drawings.
Key Areas of Responsibilities:
- Prepare detailed design drawings and specifications for mechanical equipment, using
- Computer-aided design (CAD)
- Prepare Equipment G.A.D
- Prepare Boiler G.A.D
- Prepare Ball Mills &Silo Drawings
- Prepare all Mechanical Part drawings
- Updating of Factory Layout with cable line. Water line any new addition to factory
- Plant with updated date.
- Follow standard abbreviation & Legend.
POSITIVE METERING PUMPS (I)PVT.LTD.
AMBAD MIDC-PLOT NO-M8,NASHIK-10
Aug. 2011 to Oct.2012
Position: Auto Cad Mechanical & Piping Draughtsman.
Projects Worked on:
Client: Indian Oil Corporation Ltd.
Project : Haldia Refinery (WB)
Client: Consultant Tata Consulting Engineers Ltd. Banglore
Project: Jindal India Thermal Power Ltd.
Client: Gujarat Flurochemicals Ltd.
Project: Aker Power Gas Pvt. Ltd. Mumbai
Client: Gujarat Alkalies & Chemical Ltd.
Project: Hydrogen Peroxide Expansion Project
Job Profile:
Job involves responsibilities in Oil ,Gas,Chemical,Sugar,Pharmaceuticals & Paper Industries Plant related Drafting for various units in Oil ,Gas,Chemical,Sugar,Pharmaceuticals & Paper Industries Plant such as Equipment plant for Drafting of various drawings in Piping & Mechanical engineering.includes the working on following type of drawings.
Key Areas of Responsibilities:
- Preparation of MTO
- Preparation of Line List, Valve List
- Preparation of Equipment G.A.D.
- G.A.D Of All Pumps (general arrangement diagram )
- Plunger Pump, Hydraulic pump, Screw Pump
- Cross Sectional Drawing Of All Pumps
Education
| Technical Skill | |
| Diploma | Mechanical Engineering |
| Draftsman | Certificate course in Mechanical |
| Draftsman | Certificate course in Piping & Ducting |
| AUTOCAD 2D & 3D | Version: 2000 TO 2019 |
| PDMS | Version: 11.5 |
| N.C.V.T | Machinist Grinder |
| I.T.I | Machinist Grinder |
Professionals in the same Engineering / Architecture sector as SUFIYAN Shaikh
Professionals from different sectors near Nashik, Nashik
Other users who are called SUFIYAN
Jobs near Nashik, Nashik
-
Production Manager
1 month ago
Mechwell Industries NashikProduction Manager for heavy fabrication at site execution. Plan and coordinate activities on live project sites ensuring safety and on-time delivery. · ...
-
AM/DM : R&D (Technical Product Responsible)
2 weeks ago
Epiroc NashikWe are looking for a Technical Product Responsible to accelerate the transformation of the mining and construction industries. The successful candidate will be responsible for initiating and securing changes and improvements to products, as well as ensuring proper prioritization ...
-
Operational Head
1 month ago
SYB Enterprises Nashik, MaharashtraThe Operations Head will be responsible for the end-to-end functioning of both manufacturing units including production planning, floor supervision, manpower management, quality control, line efficiency, inventory oversight and ensuring daily targets are achieved smoothly. · This ...