Job Challenges:

-
To ensure optimum availability of Cement mill throughout the year and systematic implementation of maintenance schedule to achieve production targets
:

-
Less availability of equipment's for maintenance due to high dispatches and fluctuating demands effects the equipment efficiency
:

-
To optimize operations to achieve better business results in power consumption, fuel consumption and fly ash consumptions
:


Key Result Areas:


KRA (Accountabilities) (Max 1325 Characters)

Supporting Actions (Max 1325 Characters)

  • KRA1
  • PLANT AVAILABILITY:
  • Plan, Organize and monitor implementation activities for optimum plant availability
  • Execution of preventive & corrective maintenance activities.
  • Ensure periodic checking.
  • Manpower planning one day in advance for daily jobs.
  • Proper Job planning for shutdown jobs.
  • Spare parts planning for major shutdown jobs as well as fulfilling day to day basic requirements.
  • Interaction with OEM and suppliers for elimination of critical equipment problems.
  • Execution of all the major jobs during shutdowns.
  • Planning of contractor jobs to be carried out and raise service work order accordingly.
  • Proper coordination with other departments.
  • Daily monitoring of equipment health and maintaining records.
  • Avoiding idle running of equipment's


  • KRA2

  • I) COST CONTROL:
  • Plan monitor and control spares and lubricants inventory and manpower cost as per budget in Mech maintenance activities in coal mill in order to optimize the maintenance cost.
  • Reduction in section cost by reducing breakdowns.
  • Reduction in section cost by avoiding idle running of equipment.
  • Avoid over time and optimum utilization of contract manpower
  • Control the handling cost by avoiding Spillage.


  • KRA3

  • System Management
- (Effective implementation of all IMS and other systems requirements through involvement for continuous improvement in plant working condition & quality standards)
  • To implement improvement project to reduce repetitive problems/breakdown or losses.
  • Timely submission of Kaizen, OPL, Good to fine, suggestion on system
  • Developing and sustaining Model area in respective sections
  • 100% active participation in respective KFA & GRT meetings and giving inputs related to bring new technology, innovation and improvements towards productivity. Conduct awareness programs down the level team
  • To know about IMS and other systems requirement and documents for Non-Conformity in section during internal and external audits or assessments.
  • Implementation of critical spares & consumable SOP without any defilement
  • Identify & arrange rectification of leakage points/unsafe points along with monitor & take corrective action for emission levels.


  • KRA4

  • Focus on SHE (Safety, Health & Environment) along with Sustainability initiatives
  • Ensuring 100% compliance of all safety standards and all applicable recommendations related to their concerned area.
  • Educating team about "I know my job", "I know the hazards associated with my job and I applied control measures" & "I escalate to my senior" among manpower deployed in sections/department manpower including peer, WB & CL manpower
  • Timely conducting scheduled SO round and reporting of accidents, incidents and near misses on occurrences in the area of concern in system.
  • To conduct daily Tool Box Talk as schedule and before start the job any critical job along with SWP
  • Active participation in safety training, safety sub committees, standard champions meeting and any safety event
  • Ensure good housekeeping, limited use of power, no leakage of water, oil, air etc. and reporting concerned if any abnormalities for corrective action
  • Adhering of all safety precautions on the site and off the site
  • Replicating good practice for saving environment for long run sustainability and creating awareness among an power to save guard natural resources.
**Qualification Required:

  • Diploma/ BE/ B. Tech in Mechanical
    Engineering.

Qualifications:

Diploma,Bachelor Of Technology,Bachelor Of Engineering


Minimum Experience Level:

10-12 Years


Report to:

Manager

More jobs from Aditya Birla Group