beBee background
Professionals
>
Hāpur
Prem Chand

Prem Chand

Electrician

Engineering / Architecture

Hāpur, Hapur

Social


Services offered

My experience as an Electrical Technician begins with a diploma in industrial Electrical Technician . After this, I went on to work for lot of well known manufacturers factories and in oil and gas petrochemical plants . In all of these positions, I was lead technician for the testing and troubleshooting of all technical product and processes. I am an expert dealing with all electrical machinery and equipment. As my supervisors and colleagues will attest, I have great communication skills, work well in a team, and am hardworking.
 

Approximate rate: Not specified

Experience

WORK EXPERIENCE   INDUSTRIAL AND COMMERICAL ELECTRICIAN IN GULF AND INDIA
Presently I am working  in AL DAHIA INTERNATIONAL  as an Industrial Electrical Technician from 16 
Feb.2016 to till date in Saudi Arabia. (Supplier Company) 
Petrokemya chemical  Company(North ) Jubail Saudi Arabia
Role    :  Electrical Technician
Duration : 10 April 2022 to till now
Project : Shutdown


Petrokemya chemical  Company(South) Jubail Saudi Arabia
Role    :  Electrical Technician
Duration : 07 March 2022 to 05 April 2022
Project : Shutdown 
Sahara  Petrochemical  Company ( SAMAPCO) Jubail Saudi Arabia
Role    :  Electrical Technician
Duration : 10 February 2022 to 06 March 2022
Project : Shutdown 
NETPET Petrochemical  Company Yanbu Saudi Arabia
Role    :  Electrical Technician
Duration : 15 Janbury 2022 to 05 February 2022
Project : Shutdown
NPCC Company Abu Dhabi (Aramco project safaniya) 
Role :  Electrical Technician ( Maintenance )
Duration : 11 Janbury 2021 to 27 October 2021
Project  : Onshore
NPCC Company Abu Dhabi (Aramco project safaniya) 
Role :  Electrical & Instrument Technician ( commissioning technician)
Duration : 1 July 2020 to 19 December 2020
Project  : LTA- 2 offshore project( SFNY143,SFNY31,SFNY184)
Job Responsbility:
Maintenance and Construction project have many activities Installation Cable Try & Support, EMT conduit, cable pulling, cable laying and dressing, Glanding & Termination, Continuity/Megger Test, installation for the Bus Dut and Torque all Nut-Bolt , Testing & commissioning as assistant engineer for many activities, per commissioning- commissioning for many activities, Punch list, install underground wiring and cables,  Install replace and repair electrical controls and panel boxes, Splice, join and connect wires, Test and measure voltage, loads, ground faults integrity of circuits, Troubleshoot and isolate faults, Renovate electrical systems in residential and commercial structures, Conduct preventive maintenance programs, Read and interpret blueprints, maps, drawings and specifications, Keep maintenance reports and documentation, Install and maintain wiring, control and lighting systems.Inspect electrical components, such as transformers and circuit breakers.Identify electrical problems with a variety of testing devices.
Repair or replace wiring, equipment, or fixtures using hand tools and power tools.


SULZER  CHEMTECH (UK) LTD.
Tower Field service company (Yanbu) saudi Arabia 
Role    :  Electrical Foreman
Duration : 1 May2019 to 28 January 2020
Project : Yanbu Refinery Saudi ARAMCO
Job Responsbility:
Construction project have many activities Installation Cable Try & Support, EMT conduit, cable pulling, cable laying and dressing, Glanding & Termination, Continuity/Megger Test, installation for the Bus Dut and Torque all Nut-Bolt , Testing & commissioning as assistant engineer for many activities, per commissioning- commissioning for many activities, Punch list, install underground wiring and cables,  Install replace and repair electrical controls and panel boxes, Splice, join and connect wires, Test and measure voltage, loads, ground faults integrity of circuits, Troubleshoot and isolate faults, Renovate electrical systems in residential and commercial structures, Conduct preventive maintenance programs, Read and interpret blueprints, maps, drawings and specifications, Keep maintenance reports and documentation, Install and maintain wiring, control and lighting systems.Inspect electrical components, such as transformers and circuit breakers.Identify electrical problems with a variety of testing devices. Repair or replace wiring, equipment, or fixtures using hand tools and power tools.Install, replace and repair lighting fixtures and electrical control and distribution equipment, such as switches, relays and circuit breaker panels.
IBN Shana Petrochemical  Company Saudi Arabia
Role    :  Electrical Technician
Duration : 1 March 2019 to 29 April 2019
Project : Shutdown ( Preventive Maintenance) 
Job Responsbility:
Shutdown have many activities PM jobs motor ( check by multimeter ohms, mageer),MCC(all feeder check breaker, coil omhs, check fuse,mageer busbar check overload , transfarmar, lighting ( maintenance)
SAFCO Petrochemical  Company Saudi Arabia
Role    :  Electrical Technician
 Duration : 2 January 2019 to 28 February 2019
Project : Shutdown  ( Preventive Maintenance) 
Job Responsbility:
Shutdown have many activities PM jobs motor ( check by multimeter ohms, mageer),MCC(all feeder check breaker, coil omhs, check fuse,mageer busbar check overload , transfarmar, lighting ( maintenance)
SADAF  Petrochemical  Company Saudi Arabia
Role  :  Electrical Technician
 Duration : 15October 2018 to 20 December 2018
Project : Shutdown  ( Preventive Maintenance)

Job Responsbility:
Shutdown have many activities PM jobs motor ( check by multimeter ohms, mageer),MCC(all feeder check breaker, coil omhs, check fuse,mageer busbar check overload , transfarmar, lighting ( maintenance)
SAIPEM Petrochemical  Company Saudi Arabia(offshore)
Role    :  Electrical & Instrument Technician ( commissioning technician)
Duration : 1 August 2018 to 14 October 2018
Project : LTA- 2 offshore project( SFNY22,SFNY324,SFNY184)
Job Responsbility:
Construction project have many activities Installation Cable Try & Support, EMT conduit, cable pulling, cable laying and dressing, Glanding & Termination, Continuity/Megger Test, installation for the Bus Dut and Torque all Nut-Bolt , Testing & commissioning as assistant engineer for many activities, per commissioning- commissioning for many activities, Punch list, install underground wiring and cables,  Install replace and repair electrical controls and panel boxes, Splice, join and connect wires, Test and measure voltage, loads, ground faults integrity of circuits, Troubleshoot and isolate faults, Renovate electrical systems in residential and commercial structures, Conduct preventive maintenance programs, Read and interpret blueprints, maps, drawings and specifications, Keep maintenance reports and documentation, Install and maintain wiring, control and lighting systems.Inspect electrical components, such as transformers and circuit breakers.Identify electrical problems with a variety of testing devices.
Repair or replace wiring, equipment, or fixtures using hand tools and power tools.
Advanced Petrochemical  Company Saudi Arabia
Role:  Electrical Technician
Duration : 1 March 2018 to 20 March 2018
Project : Shutdown   ( Preventive Maintenance) 
Job Responsbility:
Shutdown have many activities PM jobs motor ( check by multimeter ohms, mageer),MCC(all feeder check breaker, coil omhs, check fuse,mageer busbar check overload , transfarmar, lighting ( maintenance)

Al  Bayroni Fertilizer Company Saudi Arabia 
Role    :  Electrical Technician
Duration : 15 February 2018 to 28 February 2018
Project : Shutdown   ( Preventive Maintenance) 
Job Responsbility:
Shutdown have many activities PM jobs motor ( check by multimeter ohms, mageer),MCC(all feeder check breaker, coil omhs, check fuse,mageer busbar check overload , transfarmar, lighting ( maintenance)
SAIPEM Petrochemical  Company Saudi Arabia (offshore )
Role    :  Electrical & Instrument Technician ( commissioning technician)
Duration : 15 January 2018 to  14 February 2018
 Project : offshore project( Karan TP-l Aux.)

Job Responsbility:
Installation Cable Try & Support, cable pulling, cable laying and dressing, Glanding & Termination, Continuity/Megger Test, installation for the Bus Dut and Torque all Nut-Bolt , Testing & commissioning as assistant engineer for many activities, per commissioning- commissioning for many activities, Punch list
Petrokemya chemical company Saudi  Arabia
Role    :  Electrical Technician
Duration : 18 October 2017 to 10 January 2018
Project :   Maintenance 
Job Responsbility:
Preventive Maintenance activities motor ( check by multimeter ohms, mageer),MCC(all feeder check breaker, coil omhs, check fuse,mageer busbar check overload , transfarmar, lighting ( maintenance)
Saudi kayan petrochemical  company Saudi Arabia
Role:  Electrical Technician
Duration:  19 February 2017 to 4 April 2017
Project :  Maintiance Department (shutdown )
Job Responsbility:
Shutdown have many activities PM jobs motor ( check by multimeter ohms, mageer),MCC(all feeder check breaker, coil omhs, check fuse,mageer busbar check overload , transfarmar, lighting ( maintenance)
Saudi Petrochemical Company  (Sadaf) Saudi Arabia 
Role    :  Electrical Technician
Duration : 08 January 2017 to 18 February 2017
Project :  shutdown 
Job Responsbility:
Shutdown have many activities PM jobs motor ( check by multimeter ohms, mageer),MCC(all feeder check breaker, coil omhs, check fuse,mageer busbar check overload , transfarmar, lighting ( maintenance)

National Petrochemical Company (Yanbu) Saudi Arabia 
Role    :  Electrical Technician
Duration : 7 Nov. to 23 NoNov.20 & 1 Dec.to 13 Dec. 2016.
Project :  shutdown
Job Responsbility:
Shutdown have many activities PM jobs motor ( check by multimeter ohms, mageer),MCC(all feeder check breaker, coil omhs, check fuse,mageer busbar check overload , transfarmar, lighting ( maintenance)

Saudi petrochemical com (sadaf)
Role   :  Electrical Technician
Duration : 10 Oct to 2016 to 28 Oct. 2016
Project :  shutdown 
Job Responsbility:
Shutdown have many activities PM jobs motor ( check by multimeter ohms, mageer),MCC(all feeder check breaker, coil omhs, check fuse,mageer busbar check overload , transfarmar, lighting ( maintenance)
Saudi kayan petrochemical  com. Saudi Arabia
Role:  Electrical Technician
Duration :  15 April 2016 to 17 june 2016.
Project :  Maintiance Department (shutdown )
Job Responsbility:

Shutdown have many activities PM jobs motor ( check by multimeter ohms, mageer),MCC(all feeder check breaker, coil omhs, check fuse,mageer busbar check overload , transfarmar, lighting ( maintenance)
Kumyang Electric Co.,Ltd West Qurna, Iraq
Role:  Electrical Technician/  QC Assistant/ EZ- Operator( Tag making Software) 
Duration:  12 July 2013 to 05 March 2014.
Project :  Early Oil Phase Project 
Description :  Construction of Oil & Gas Plant
Client:  Lukoil Oil Company (SOC)
Job Responsbility:
Knowledgeable:  Installation Cable Try & Support, Glanding & Termination, Continuity/Megger Test, installation for the Bus Dut and Torque all Nut-Bolt & all inspection prepared knowledge AFI Report,  and EZ-Operator knowledge( TAG Software).

Qanbar Dywidag Precast Concrete Company Limited, 
Jubail Kingdom of Saudi Arabia
Role:   Industrial Electrician (Maintenance Department) 
Duration :  10 Nov. 2010 to 10Jan 2013.

Job Responsbility: (Knowledge for repair particulars)
 
Dewalt and Bosch Grinder (Straight Grinder, Angle Grinder) (Knowledge for assemble all type Grinder)
SPIT- HILT
STETTER  Batching Plant and KTI ICE Plant, Cold Water Plant
MEP-  Wire Mesh Bending Machine and Cutting Machine
STEMA PEDAX Bending Machine
ECHO Hollow Core Cutting Machine
WENER Over Head Crane 
POTAIN  Tower Crane (12 &16 Tone)
Grindery Crane 
Multi Engineering  Services, New Delhi
Role:  Industrial Electrician
Duration: Oct. 2001 to July 2010.

Universal Engineering Company, New Delhi
Role: Industrial Electrician 
Duration:  Feb. 1996 to August 2001.
WORK  EXPERIENCE IN COMPUTER 
I.C.M.( Institute of Computer Management) Dural, Meerut 
Role:  Faculty 
Duration:  March 1998 to Oct. 1998.

D.A.V. Public School, Ghaziabad 
Role :  Faculty 
Duration :  Nov. 1998 to  Oct. 1999.

Ved Creative Public School, Plikhuwa 
Role :  Faculty 
Duration :  Jan. 2000 to April 2002.

Gupta Publication , Meerut 
Role :  D.T.P. Operator 
Duration :  June 2002 to Aug. 2002.

I.M.R. (Institute of Management and Research Centre) , Ghaziabad
Role:  Data conversion job (PDF to DOC with OCR Software Fine Reader 5)
Duration :  Nov. 2002 to Jan. 2003.

Pan American Medical Transcription Institute, Gahaziabad 
Role:  Data conversion job (PDF to DOC with OCR Software Fine Reader 5)
Duration:  Feb. 2003 to Jan. 2004.

Sawad Software Solution Pvt. Ltd. , Nodia
Role:  Data conversion job (PDF to DOC with OCR Software Fine Reader 5)
Duration:  Feb. 2004 to May 2004.

Mega Technology Pvt. Ltd., Ghaziabad 
Role:   M.I.S (Management of Information System) 
Duration:  July 2004 to Oct. 2004.

DCM Boys Sr. Sec. School, Kishan Ganj, Delhi-110006
Role:  IT Assistant
Duration:  November 2008 to December 2009.

DCM Boys Sr. Sec. School, Kishan Ganj, Delhi-110006
Role:   Jr. Faculty (computer)
Duration: November 2004 to November 2008.


 

Education

10th

12th

Bachlor of Art 

Diploma in industrial electrician 

Diploma in Information System Management from APTECH COMPUTER CENTER Hapur 

Trade certificate in Electrical 

Professionals in the same Engineering / Architecture sector as Prem Chand

Professionals from different sectors near Hāpur, Hapur

Other users who are called Prem

Jobs near Hāpur, Hapur

  • Work in company

    Electrician

    Eppeltone Engineers Pvt. Ltd

    Eppeltone Engineers Limited is hiring skilled Electricians for field work to support installation maintenance and troubleshooting of electrical systems at project sites the role requires hands on technical work and readiness to travel to sites as assigned · ...

    Greater Noida, Uttar Pradesh

    1 month ago

  • Work in company

    Electrician

    Metropolitan Design Studio

    Metropolitan Design Studio is looking for site engineers & supervisors for Delhi NCR location. · ...

    Noida Sector , Delhi-NCR

    1 month ago

  • Work in company

    Sr. Electrician

    confidential

    Roles and Responsibilities - · Execution of the projects as per the given deadlines. · Candidate should have knowledge of reading electrical Drawing. · Candidate should have experience of PLC wiring, VFD drive. · Candidate Should have knowledge of hard wiring (Relay & Contractor) ...

    Meerut

    12 hours ago