beBee background
Professionals
>
Engineering / Architecture
>
Vellore
Thirunavukkarasu S

Thirunavukkarasu S

Installation And Commissioning Engineer
Vellore, Vellore district

Social


Groups

  • Ajim Husain

    Ajim Husain

    Love is blind

    2 members · 0 Posts

  • Environment India

    Environment India

    India's only Environment focused news site. The sole purpose of this site is to give ecology/environment related news es ...

    9 members · 26 Posts

  • Oil and Gas field

    Oil and Gas field

    Engineering Professional, · Commissioning consultant

    10 members · 0 Posts


About Thirunavukkarasu S:

I would like to bring the following few lines for your kind consideration. I came to know from reliable sources that there is a vacancy in your organization. So, I am applying for respected vacancy.

Experience

Experience:- 

 

Working as Sr. Service Engineer in M/s. ION EXCHANGE SERVICES LTD, Period:  April 2004 to – June 2012

 

Working as project engineer in Suntech Asia Ltd, Period: June 2012 to January 2015

 

Working as an Erection and Commissioning Engineer – PT Ionexchnage Asia pacific Tbk.  Period: March 2015 to May 2017

 

Working as Commissioning Engineer – Wipro water (Wipro Enterprises pvt ltd) Period: 

June 18’ 2018 to till date.

                                                       

 

 

 

CAREER OBJECTIVE 

 

As Engineering Specialist - Water and Waste Water Systems, Reviewed/developed technical specifications for Waste Water Systems R.O plant D.M plant, CPU plant, RODM plant STP, R.O with EDI, MBR  

 

Potable water system :

 

Which include oil water separator, sewage treatment plant, hot blow down cooling system and various pumping systems. Reviewed offers and documentation from suppliers. Responsible for waste water system PID, system manual and waste water source list. Coordinated with Electrical, I&C, Civil and Arrangement departments in aspects relevant to water and waste water treatment. Developed detailed calculations for water systems

                                                                                            

During Installation / Commissioning:

 

  • Supervision during erection and installation of Processing plants, and storage tanks.
  • Co-Ordination with Vendors for Designing layout, & Installation/Commissioning of utility Equipment. 
  • Assisting project Manager in new jobs & equipment selection. After Installation/Commissioning 
  • Look after overall functions of Operation, process, and other manufacturing related activities (water treatment & bulk storage) from supply chain to dispatch, including documentation, and Scheduling. 
  • Monitor & control process parameters, operational & utility requirements & all technical, administrative & quality issues related to emulsion section.
  • Supervise overall activities of the emulsion section to achieve maximum utilization of the capacity & to control the cost of production by controlling the wastage of material, energy & paid hours.
  • Generate comprehensive production & process monitoring reports for analysis & improvement.
  • Plan, schedule & execute monthly production, including material & manpower arrangements.
  • Provide technical assistance & supervision for quality control monitoring of finished product.
  • Co-ordinate with maintenance Department for preventive & annually maintenance.

 

Achievements : Start-Up & Handle new plant independently (Commissioning, Operation & 

  Management) 

  • Process selection and modifications, trial runs and scale up activities for production.
  • Developing safety, quality, health, & environment management system documentation such as standard operating procedures, work instructions, process flow charts etc.
  • Provided On-Hand Trainings on Operations, Process, Quality, & Safety System to Operators & Staff.

 

 

 

Key Projects :

 

 

          01) IOCL Panipat: 75M3/Hr DM plant with pre-treatment ETP75m3/Hr and DM water          storage tank

 

As LSTK project Residential construction manager for the water treatment plant, managed, the subcontractor contracted to commission and operate the water treatment plant 75M3/Hr DM plant with pre-treatment ETP 75m3/Hr and DM water storage tank an ion exchange plant for demin water production.

Also supervised chemical dosing and water-steam cycle chemistry analysis for all systems 

 

  1.  Neyveli lignite Corporation: 1000m3/Hr PT plant, 900m3/Hr X3 Softener, 75 m3/ Hr  DM plant , 100KLDX2 STP, 300m3/Hr ETP.

As Turnkey Commissioning engineer for the water treatment plant, managed, the subcontractor contracted to commission and operate the water treatment plant 1000m3/Hr PT plant, 900m3/Hr X3 Softener, 75 m3/ Hr  DM plant , 100KLDX2 STP, 300m3/Hr ETP an ion exchange plant for demin water production.

Also supervised chemical dosing and water-steam cycle chemistry analysis for all systems 

 

 

03) Bharat Oman Refinery Limited: CPU 150 m3/Hr., RO DM 150 m3/Hr

 

As Turnkey Commissioning engineer for the water treatment plant, managed, the subcontractor contracted to commission and operate the water treatment plant an ion exchange plant for Demin water production.

Also supervised chemical dosing and water-steam cycle chemistry analysis for all systems 

Participated in Commissioning of Condensate Polishing Plant. 

Operator routes. 

EPC Experience : Civil works, Erection Supervision, PP/SS/CS/GRP/PVC piping systems,    hydro tests, erection turnover inspection. 

04) Asian Paints Ltd, Mysore : HRSCC - 70m3/hr. DMF, Softener, UF, with Two Pass RO

As Turnkey Commissioning engineer for the water treatment plant, managed, the subcontractor contracted to commission and operate the water treatment plant and Reverse osmosis plant.

 05)    PT Chikarang Power Plant Indonesia Tbk – Near Jakarta.  Erection of 

         Raw water treatment plant – 100 M3/Hr. DM plant – 40 M3/Hr.  Waste 

         Water treatment 150 M3/Hr. with DCS system.

 

06)  PT Unilever Indonesia Tbk (Euro Asiatic) – Raw water treatment plant 

       With RO plant – 33 X 2 M3/Hr. Erection and commissioning. 

 

07)  Pelita Chikarang Paper Industries - Raw water treatment plant 

       With RO plant – 33 X 2 M3/Hr. Erection and commissioning

 

08)  PT Unilever Indonesia Tbk –

  a. Raw water treatment – 90M3/Hr. 

      Softener – 45 M3/Hr. & RO plant - 7 M3/Hr. RO plant 

  b. Erection and commissioning of Waste water treatment plant – 650 

M3/day with RO plant with DCS control system. 

 

09)  Harwheel Cluster phase 2 at Oman: 8 m3/hr X 2 EDI RO plant with primary RO 12  

       m3/hr X 2 and secondary RO 8 m3/hr. with pretreatments

      Water Treatment Plant Commissioning at the biggest project in 2010, I was brought in at the      early construction phases 2 at Harwheel Cluster in 0MAN south oil and gas with power station to participate in the engineering review and oversee water treatment plant construction to prepare the plant for the commissioning and operations phase of the project.

 Part of my duties are : Training operators and chemists on plant operation and water quality monitoring. Contributed to the understanding/critique of water treatment/analysis systems during the engineering phase. Supporting the environmental department in QCPDO permitting efforts and water analyses. Supporting efforts for REACH compliance. According of technical testing materials. Currently we are in the commissioning phase of the water treatment plant which includes, sand filters, Activated carbon filter, ISR filters, Reverse Osmosis units, EDI,potable water treatment plant, a, chemical unloading and dosing equipment and a lignite and water analysis lab. 

Operations experience : trained operators on monitoring plant parameters and entering data in various journals, developed SOP procedures, developed plant

 

10) Qatar Fertilizer Company at Qatar: 200 m3/hr X 3 Mixed bed with LCS & DCS Control

As Turnkey Commissioning engineer for the water treatment plant, managed, the subcontractor contracted to commission and operate the water treatment plant an ion exchange plant for demin water production.

Also supervised chemical dosing and water-steam cycle chemistry analysis for all systems 

Participated in Cold Commissioning of Condensate Polishing Plant. 

Operator routes. 

Construction experience: Civil works, erection supervision, PP/SS/CS/GRP/PVC piping systems, hydro tests, erection turnover inspection. QA/QC Experience: Participated in many electrical, mechanical, welding, and civil inspections

11) Uganda sugar corporation at Uganda80 m3/hr. DM Plant with Mixed bed


 Checked erection completion of equipment, instruments and piping on site. 

 

 Trained local engineers in water treatment, brine/caustic preparation/recovery and decolorization process


 Supervised cold and hot commissioning of the brine preparation. 


 Improved EHS on site by reporting on safety and environmental issues and labeling of all equipment especially chemical equipment with safety signs.


 Advised owner and local engineers on implementing EHS culture on site 

 

 

12) Zimbabwe Power company at Zimbabwe : 181 m3/hr X 2 RO with Mixed bed with LCS control

As Turnkey Commissioning engineer for the water treatment plant, managed, the subcontractor contracted to commission and operate the water treatment plant which includes four gravity sand filter two clarifiers and attached chemical dosing equipment, sand filtration plant for production of 181 m3/hr. X 2 RO cooling water and an ion exchange plant for demin water production.

Also supervised chemical dosing and water-steam cycle chemistry analysis for all BOP systems and boiler Operator routes.         

13) Ranipet Common ETP at Ranipet : 100 m3/hr MBR trail run.

 

14) Brakes India ltd Unit -II at Sholingher :20 m3/hr STP with post treatment 

 

15) Moon Orchid Pvt ltd at Villupuram : 40 m3/hr. X 2 RO plant with pretreatments80 m3/hrX2

 

16) MRF Ltd Ty re plant at Arakkonam :25 m3/hr capacity RO plant with pretreatments 50m3/hr

 

17) Midas Golden distilleries : 40 m3/hr Capacity Ro plant with pretreatments 80 m3/hr.

 

18) Dr. Reddy's Laboratories Ltd at Hydrabad : 10 m3/hr EDI RO with primary RO 12m3/hr. and pretreatments 20m3/hr.

 

19) Santha bio-tech ltd at Hydrabad: 8 m3/hr. EDI RO with primary RO 20m3/hr. and pretreatments 30m3/hr.

 

20) ITC Ltd at Chennai : 15 m3/hr. STP out let covert to Softwater 10m3/hr.

 

21) Brakes India ltd Unit -II at Sholingher : 20 m3/hr. STP with post treatment

 

22) Jain Irrigation Ltd unit – II at Chittore : 8 m3/hr DM plant with pretreatments30 m3/hr

 

 

 

Education

  1. Diploma in Mechanical Engineering. Passed first class with Distinction (77%) on 1995 from Board of Technical Education, Chennai. Tamilnadu, India
  2. H.S.C passed 1990
  3. Computer Knowledge : Microsoft Excel, Word, AutoCAD, PowerPoint & office

Professionals who compete with Thirunavukkarasu

Professionals in the same Engineering / Architecture sector as Thirunavukkarasu S

Professionals from different sectors near Vellore, Vellore district

Other users who are called Thirunavukkarasu

Jobs near Vellore, Vellore district

  • Kukulkan Manpower Consultancy

    Jewellery Showroom Manager

    Found in: Talent IN C2 - 1 week ago


    Kukulkan Manpower Consultancy Vellore, India Full time

    Job Overview · Senior-level position with 7 to 10 years of experience in Vellore, Tamil Nadu, India. Full-Time employment. · Qualifications and Skills · Experience in handling jewellery, diamonds, and luxury goods · Strong knowledge of showroom management and store operations · A ...

  • TeacherOn

    Online Voice, Western Vocals tutor

    Found in: beBee S2 IN - 7 hours ago


    TeacherOn Vellore, India Part time

    western vocals and voice trainer · Level: Grade 2 · Gender Preference: None · Meeting options: · Available online - via skype etc. · At home - Student can meet at their place. · Student can travel 5 km ...

  • Business HR Solutions (Consultancy) Limited

    Duty Doctor

    Found in: Talent IN C2 - 1 week ago


    Business HR Solutions (Consultancy) Limited Vellore, India Full time

    Job Overview · We are seeking a highly skilled and dedicated Duty Doctor. As a Duty Doctor, you will be responsible for providing medical care to patients and assisting with emergency situations. This is a full-time position based in Vellore, Tamil Nadu, India, and requires 1 to ...