Dcs Operator - Raipur, India - Kaapro Management Solutions

Deepika Kaur

Posted by:

Deepika Kaur

beBee Recuiter


Description
Opening: 1 Nos


  • Job ID:

Employment Type:

Full Time- Reference:
Work Experience: 2.0 Year(s)

To 5.0 Year(s)- CTC Salary: 1.80 LPA TO 3.

60 LPA- Function: Production / Quality / Maintenance- Industry: Steel/Metal/Iron/Non-ferrous- Location:


  • Raipur
Posted On: 20th Nov, 2023


B.E/Diploma (Mech.) with 2 to 3 years experience as a DCS OPERATOR (WHRB ) -POWER PLANT in operation**.


Responsible for all instrument and control system equipment regular maintenance and repairing, such as all field instrumentation, valves, flow meter, transmitter, control circuit, monitoring,DCS, PLC etc.

To be familiar with all equipment in plants, maintain all maintenance equipments accurate documents integrity and equipment history database reachable.

Knowledge of different types of Flow meters Like Magnetic Flow meter, Vortex flow meter, & DP type Flow meter.
Able to create control loop in DSC / PLC and operating screens of SCADA.


Key Skills:


  • Dcs Engineer
  • Scada
  • Hmi
  • Dcs
  • Turbine
  • Boiler
  • Process Control
  • Dcs Engineer
  • T & B
  • Eng Distributed
  • Control System
  • Eng D.c.s. Eng

Company Profile:

Existing plant of 33,500 TPA of MS Ingots (only 16,750 TPA is commissioned) & 4800 TPA
of TMT Bar has obtained Consent from Regional Office - Raigarh, Chhattisgarh
Environment Conservation Board (CECB) vide letter no. 153/RO/TS/CECB/2008 Raigarh
dt. 16th May 2008.

  • Obtained Environment Clearance for 90,000 TPA Sponge Iron, 33,500 TPA to 1,23,500
TPA of MS Billets, 90,000 TPA TMT Bars / Structural - / Wire Rod Mill, WHRB Power
Plant (6 MW) & FBC Power Plant (12 MW) from MoEF, New Delhi vide F.No. J11011/308/2009/ IA II (I) dated 29th March 2011& 9th July 2018 (Validity Extension).

  • Obtained Consent for Establishment for 90,000 TPA Sponge Iron, 33,500 TPA to
1,23,500 TPA of MS Billets, 90,000 TPA TMT Bars / Structural - / Wire Rod Mill,
WHRB Power Plant (6 MW) & FBC Power Plant (12 MW) from CECB vide
4291/TS/CECB/2014 dated 21st October 2014.

More jobs from Kaapro Management Solutions